6 February 2012, 16:40
(6 February 2012, 16:31)uks Wrote: Allotments are very busy places not really any chance of keeping something like that. Even a small structure how many tonnes to move?. Remember 1 square yard = 1 tonne
That's a fair point. I was thinking about putting 4 sheds together in a 2x2 layout, covering the joining corners of the allotments. From then it would be pretty easy to pull up 1 shed floor and start digging. I was also thinking of working through the nights. Not that I would take speed, but Friday night after work until Sunday lunch time (to allow for comedown) work almost non-stop.
The least would have been a host of different caches under each shed. But if there's a waiting list, neither are really that possible anyway.