3 September 2017, 19:41
Painted all four walls and ceiling...two coats , laid cushion floor covering,fixed the steel racks,put in the freezer and fridge today ...worktops and Belfast sink were put in Friday /Saturday all joints were tapped and corked up ......the only thing left to do is the electrics which i will sort out tomorrow (Monday) the LPG Hob is coming Tuesday and i will fit that and then i will be ready to rock n roll ! ......another job done and scratched off the list....moved the greenhouse this morning....to the bottom garden so sil can get stuck in glazing up....Next up .....the aquaponics set up ....12 ft x 12 ft building ......but i will have to make a new door n frame for the poly tunnel first ...or it could end up in West Wales.