28 December 2020, 19:39
Had a good day today ! Removed the poly tunnel stripped out the electrics ......then levelled up the ground with the digger ......cut and levelled in the timber ring beam to form the outline of the building , fitted the dp membrane and marked up all the joist centres , I will drop them in tomorrow and lay the insulation and drop the floor sheeting I will crack on with the walls and roof joists Wednesday and sheet all the external by this coming weekend ....so long as the weather holds up ! Onwards men ! Wait for the whistle ......charge !