22 April 2017, 14:53
Waiting on some ground works to be completed ....should be done by the end of next week , soon as that's done will move the poly tunnel back in position and reintroduce some hens along with a new hen house and fence off a nice run, will move in the IBC tank 900 lts and set that up permanently .
Then its back to comms and get that all set up and running....so there's still lots to do to keep SS out the way of the traffic .....more food prepps being gathered and ongoing ...had some 10 ltr tubs given me ... six ....all filled ready to cache .
Then its back to comms and get that all set up and running....so there's still lots to do to keep SS out the way of the traffic .....more food prepps being gathered and ongoing ...had some 10 ltr tubs given me ... six ....all filled ready to cache .